High intensity discharge electronic ballast circuit, electronic ballast, and high intensity discharge lamp

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9072151
APP PUB NO 20140001957A1
SERIAL NO

14004647

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A high intensity discharge (HID) ballast circuit comprises a trigger circuit, a power half-bridge self-excited oscillation circuit, which is arranged to enable self-excited oscillation by energizing an angle capacitor Cgs with a Miller capacitor Cdg of a power MOSFET when an original single pulse output by the trigger circuit is excited, and then output self-excited oscillation signals; and a filter loop which is arranged to match impedance for the self-excited oscillation signals, thereby converting a low-impedance voltage source to a high-impedance constant current source. The inherent phase relationship of the power MOSFET is utilized, and oscillation signals are generated by a power half-bridge self-excited oscillation circuit, and then impedance matching for the oscillation signals is performed by the filter loop, and finally an HID lamp is triggered. As a result, damages to human eyes caused by stroboscopic effect can be avoided and electro magnetic compatibility test can be passed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GUANGDONG GREENLIGHT PHOTOELECTRIC TECHNOLOGY CO LTD2 EAST 626 ROOM SEG INDUSTRIAL ZONE ZHENXING ROAD SHENZHEN GUANGDONG 518028 CHINA SHENZHEN CITY GUANGDONG PROVINCE 518028

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Yujia Shenzhen, CN 7 5
Xie, Lishan Shenzhen, CN 1 0
Yang, Hongmin Shenzhen, CN 2 0
Yuan, Qinghui Shenzhen, CN 35 254

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 30, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00