Connector

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9071014
APP PUB NO 20130189870A1
SERIAL NO

13732592

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A connector of the invention includes first and second conducting parts and a coupling part. The coupling part couples ends of the first and second conducting parts to allow the first and second conducting parts to turn from a closed position, in which the first and second conducting parts sandwich therebetween a conductor having flexibility, to an open position, in which the first and second conducting parts release the conductor. At least one of the first and second conducting parts includes a locking projection. The locking projection is configured to swing in accordance with the turning of the one of the conducting parts and pass through the conductor. The locking projection is of a curved form conforming to a swing track of the locking projection.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HOSIDEN CORPORATION4-33 KITAKYUHOJI 1-CHOME YAO-SHI OSAKA 5810071
TOYOTA BOSHOKU KABUSHIKI KAISHAJAPAN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Akaike, Fumitoshi Miyoshi, JP 87 938
Ishii, Atsushi Nagoya, JP 270 5012
Kawabata, Yuuki Toyota, JP 1 2
Masamoto, Shinichi Nagoya, JP 1 2
Shimizu, Takashi Yao, JP 409 3170
Tanaka, Akihiro Yao, JP 236 2204

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 30, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00