Railcar

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9067606
APP PUB NO 20140150688A1
SERIAL NO

14000271

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

There is provided a railcar including a under frame, paired side bodyshell parts, and a roof bodyshell part. Strap bar receiving parts hanging downward from the roof bodyshell part are fixed to the roof bodyshell part. An upper horizontal member and a lower horizontal member are provided like bridges between the paired side bodyshell parts. The upper horizontal member and the lower horizontal member are disposed at an interval in a vertical direction and connected by connection pipes. The upper horizontal member is formed by a plurality of reinforcement pipes and the lower horizontal member is formed by a plurality of reinforcement pipes. At least one ends of the plurality of reinforcement pipes are fixed to the strap bar receiving parts.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KAWASAKI RAILCAR MANUFACTURING CO LTD1-18 WADAYAMA-DORI 2-CHOME HYOGO-KU KOBE-SHI HYOGO 652-0884

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Asaka, Tetsuya Yokohama, JP 1 5
Azuma, Takashi Kobe, JP 92 1173
Kato, Jin Shibuya-ku, JP 6 18
Kojima, Aya Shibuya-ku, JP 1 5
Koyama, Kenichi Koto-ku, JP 55 653
Mizutani, Keisuke Shibuya-ku, JP 20 18
Ono, Takashi Yokosuka, JP 389 4413
Taguchi, Makoto Akashi, JP 41 259

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 30, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00