Method and apparatus for coordinated multi-point communication for each sub-band based on long-term channel state information

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9065493
APP PUB NO 20120027108A1
SERIAL NO

13034836

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a coordinated communication method and apparatus that may perform coordinated communication based on long-term channel information, for each sub-band. Base stations may exchange scheduling information of each sub-band with each other to determine a priority among the base stations, and may perform rescheduling for each sub-band based on the determined priority. The base stations may obtain the long-term channel information, and thus may reduce overhead occurring with exchanging of information between a base station and a terminal or between base stations, and may decrease damage due to a delay of channel information associated with a terminal.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAMSUNG ELECTRONICS CO LTDGYEONGGI DO SOUTH KOREA GYEONGGI-DO
SNU R&DB FOUNDATIONCROWN 1 YUE YUE ROAD SEOUL KOREA SEOUL SEOUL

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Choi, Sung Hyun Seoul, KR 17 72
Clerckx, Bruno Seoul, KR 70 1707
Hong, Young Jun Seoul, KR 144 1092
Je, Hui Won Gwacheon-si, KR 4 26
Lee, Hye Won Yongin-si, KR 34 970

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 23, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00