Government structures and neighborhood leads in a geo-spatial environment

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9064288
APP PUB NO 20140189013A1
SERIAL NO

14191454

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method, apparatus and system of determining neighborhood leads and forming government structures in an online geo-spatial social community are disclosed. A method of organizing a community network includes obtaining a region on a geo-spatial map, obtaining a first subset of members of the community network associated with the region, determining a second subset of the members with a highest number of points from the first subset, creating a representative body (e.g., based on an activity level of each of the first subset) from the second subset, and enabling the representative body to manage a portion of the community network associated with the region. A lead member user may be appointed or designated from the representative body from the second subset of the plurality of members with the highest number of points from the first subset based on an acceptance of the lead member (having additional access privileges).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ABHYANKER RAJ1580 W EL CAMINO REAL SUITE 14 MOUNTAIN VIEW CA 94040

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Abhyanker, Raj Cupertino, US 57 3476

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 23, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00