Control circuit for a buck power factor correction stage

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9059640
APP PUB NO 20100002469A1
SERIAL NO

12165959

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

This invention relates to a control circuit for a buck power factor correction (PFC) stage. Buck PFC stages are commonly used in low cost, high efficiency power converters. These buck PFC stages are typically controlled using a very slow control loop with a crossover frequency of the order of 10 to 20 Hz. However, such a slow response is unsuitable for applications requiring overvoltage protection. The present invention overcomes the problems with the known control circuits for buck PFC stages by implementing a two stage control circuit having a fast outer loop control circuit and a slow inner loop control circuit. The fast outer loop control circuit is in operation during low load conditions and the slow inner loop control circuit is only active under load.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TEXAS INSTRUMENTS INCORPORATED12500 TI BOULEVARD M/S 3999 DALLAS TX 75265

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Keogh, Andrew Bernard Glanmire, IE 6 48
Long, William James Cork, IE 5 34
Meaney, Peter Michael Cloyne, IE 3 8
O'Driscoll, Seamus Martin Cloyne, IE 1 2
Young, George Blackrock, IE 38 237

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 16, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00