Sample viscosity and flow control for heavy samples, and X-ray analysis applications thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9057685
APP PUB NO 20130044858A1
SERIAL NO

13584978

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An x-ray analysis system having an x-ray engine with an x-ray source for producing an x-ray excitation beam directed toward an x-ray analysis focal area; a sample chamber for presenting a sample stream to the x-ray analysis focal area, the analysis focal area disposed within a sample analysis area defined within the chamber; an x-ray detection path for collecting secondary x-rays and directing the x-rays toward a detector; an x-ray transparent barrier on a wall of the chamber through which the x-rays pass; and a blocking structure partially blocking the sample analysis area, for creating sample stream turbulence in the sample analysis area and over the barrier. The blocking structure may be disposed asymmetrically about a central axis of the x-ray analysis focal area and/or the sample analysis area; and may be a rounded pin. A heating element may be used to heat the sample stream for improving flow.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
X-RAY OPTICAL SYSTEMS INC15 TECH VALLEY DRIVE EAST GREENBUSH NY 12061

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Allen, George Middle Grove, US 40 351
Cheriyan, Sony Jersey City, US 3 20
Shakshober, Stuart Hudson, US 1 9

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 16, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00