System and method for producing, preparing, or manufacturing natural rubber-based ABS compositions, powders, substances, and/or additives

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9056937
APP PUB NO 20120302684A1
SERIAL NO

13376599

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for producing natural rubber-based acrylonitrile butadiene styrene (ABS) powder. The process comprises introducing a portion of natural rubber, mixing divinylbenzene (DVB) with the portion of natural rubber to produce vulcanized natural rubber, mixing the vulcanized natural rubber with a monomer solution to produce grafted natural rubber, mixing a plurality of grafted polybutadiene rubbers with the grafted natural rubber to produce a latex masterbatch and mixing a coagulant to a portion of the latex masterbatch to produce natural rubber-based ABS powder. By mixing the DVB with the portion of natural rubber, an intermediate step which is required in conventional methods before the polymerization process, can be eliminated. A natural rubber-based acrylonitrile butadiene styrene (ABS) powder produced by the process is also disclosed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
IRPC PUBLIC COMPANY LIMITED299 MOO 5 SUKHUMVIT ROAD TUMBON CHUENGNUEN AMPHOR MUANG RAYONG 21000

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kwampian, Suthep Rayong, TH 3 12
Lamtaptimthong, Worawan Rayong, TH 3 12
Phonthong, Ronnapa Rayong, TH 3 12

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 16, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00