Method for manufacturing resin for urethane-based optical material, resin composition for same, and optical material manufactured thereby

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9052436
APP PUB NO 20130303721A1
SERIAL NO

13977485

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of preparing an optical material by polymerizing a resin composition including a thiol group-containing compound and an isocyanate group-containing compound, particularly, a method of preparing a high-quality urethane-based optical material using a universal polyisocyanate compound. According to one aspect, a resin composition including a polythiol compound and a widely available polyisocyanate compound, as main components, and having a moisture content of 300 to 3,000 ppm is template-polymerized to prepare the optical material. A colorless, transparent, and high-quality urethane-based optical material may be efficiently prepared in high yield using a low-cost and widely available isocyanate compound through template-polymerization using a tape while minimizing generation of white tape residues and foaming.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUI CHEMICALS INCTOKYO JAPAN TOKYO METROPOLIS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jang, Dong Gyu Daejeon, KR 14 48
Kim, Jong Hyo Daejeon, KR 23 148
Roh, Soo Gyun Daejeon, KR 10 32

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 9, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00