Reaction equipment for producing sponge titanium

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9051628
APP PUB NO 20120306129A1
SERIAL NO

13585770

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention provides a piece of reaction equipment for producing sponge titanium, which includes a reactor and a reactor cover with a stirring device, wherein a sealing ring is arranged between the reactor cover and the reactor, one side of the reactor cover is provided with a lifting device for controlling the lifting of the reactor cover, a resistance furnace is arranged above the reactor cover, a valve is arranged below the resistance furnace, and a vacuum-pumping pipe and an inflation pipe are arranged above the reactor cover. The present invention has the beneficial effects that the production equipment can ensure normal production, and effectively ensures the quality of sponge titanium product; compared with the prior art, the equipment has low cost, environmental protection and harmlessness during production.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SHENZHEN SUNXING LIGHT ALLOYS MATERIALS CO LTD518107 GUANGMING NEW DISTRICT HI TECH INDUSTRIAL PARK XINXING DISTRICT GUANGDONG SHENZHEN SHENZHEN CITY GUANGDONG PROVINCE 518107

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Xuemin Guangdong, CN 418 7174
Li, Bin Guangdong, CN 1200 10531
Ye, Qingdong Guangdong, CN 25 29
Zeng, Hexi Guangdong, CN 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 9, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00