Generating electrical power utilizing surface-level hot air as the heat source, high atmosphere as the heat sink and a microwave beam to initiate and control air updraft

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9049752
SERIAL NO

13865556

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention describes a method of generating electrical power utilizing hot surface air as the heat source, high atmosphere as the heat sink and a microwave beam aimed upward providing updraft to initiate and control the large-scale air circulation. The frequency of the microwave beam is centered at approximately 60 GHz, within the absorption band of molecular oxygen, so as to result in beam penetration to an altitude of several kilometers. The power plant comprises a high-power microwave source, e.g. a bank of gyrotrons, one or more turbine-generator sets, and—optionally—a condenser/cyclone (if on a floating platform). The plant can also provide clean water from condensation out of humid, sea level air. The plant could also be used to remove atmospheric carbon dioxide from large quantities of air. The dynamic chimney produced by the microwave beam could alternatively be deployed in conjunction with a solar heat power plants, industrial chimneys, and cooling towers of conventional power plants to increase their effective height.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AELLA SATECHNOPARKSTRASSE 1 ZURICH CH-8005

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Tepic, Slobodan Zurich, CH 75 2692

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 2, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00