Method and apparatus for intensity calibration of multi-beam lidar sensors

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9046600
APP PUB NO 20140152971A1
SERIAL NO

13705212

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of multi-beam Lidar intensity measurement calibration including determining, by a positioning device, position information of a moving platform within a global reference frame, collecting a plurality of data points, each data point including the position information and intensity information from a plurality of beams, segmenting the plurality of data points into a plurality of voxels, based on the position information associated with each data point, finding a subset of voxels in the plurality of voxels that include a point corresponding to a certain beam in the plurality of beams and an intensity value in a predetermined neighborhood of a certain intensity value, estimating a probability density based on the subset of voxels, and generating a calibration map that maps the certain intensity value of the certain beam to a calibrated intensity value for the certain beam, based on the probability density and a prior density.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYOTA JIDOSHA KABUSHIKI KAISHA1 TOYOTA-CHO TOYOTA-SHI AICHI-KEN 471-8571

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
James, Michael R Northville, US 27 898

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 2, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00