Power control circuits and methods

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9046382
APP PUB NO 20130187621A1
SERIAL NO

13744377

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Power control circuits and methods are disclosed, suitable for a power supplier. A power control circuit has a clock generator, a phase controller and a power limiter. The clock generator provides a clock signal, substantially determining switching cycles of a power supply. The phase controller outputs a burst signal based on a group reference signal and a burst initiation signal, and makes a burst period corresponding to a burst signal not less than a group reference period corresponding to the group reference signal. The burst signal is capable of switching the power supplier between a switching state and a non-switching state. The power limiter limits the power transferred by the power supply in every switching cycle, during a burst-up duration after the power supply is switched from the non-switching state to the switching state. The burst initiation signal correlates to an output voltage of the power supplier.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LEADTREND TECHNOLOGY CORP4F NO 18 PROSPERITY RD II SCIENCE-BASED INDUSTRIAL PARK HSIN-CHU

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chou, Shun-Chin Hsin-Chu, TW 4 18
Yang, Chen-Lun Hsin-Chu, TW 4 13

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 2, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00