Tensioning clamp for fastening a rail and system equipped with a tensioning clamp of this type

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9045866
APP PUB NO 20120111960A1
SERIAL NO

12939858

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A tensioning clamp for fastening a rail comprising a centre portion, at least one torsional portion branching off from the centre portion in the lateral direction, at least one transitional portion adjoining the torsional portion, at least one holding arm which is connected to the transitional portion and an end portion of which holding arm associated with a free end of the holding arm is oriented bent in relation to the torsional portion viewed in a plan view of the tensioning clamp, and a bearing region extending over the length of the end portion configured on the bent end portion of the holding arm, wherein the end portion is bent in relation to a part piece of the holding arm adjoining it in such a way that when the tensioning clamp is completely assembled, the bearing region, over its entire length, rests linearly on a rail foot of a rail to be fastened.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
VOSSLOH-WERKE GMBHVOSSLOHSTRASSE 4 WERDOHL 58791

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bösterling, Winfried Neuenrade, DE 26 77

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 2, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00