Method and apparatus for pyrolysis and gasification of biomass

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9045703
APP PUB NO 20130125465A1
SERIAL NO

13745861

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for pyrolysis and gasification of biomass by: a) providing a gasifier and a pyrolysis furnace; heating and introducing a solid particle, or a plurality thereof, into the gasifier and the pyrolysis furnace; b) grinding and feeding the biomass into the pyrolysis furnace while spraying saturated water vapor into the pyrolysis furnace, contacting the biomass with the saturated water vapor at 500-800° C. to yield crude synthetic gas and ash including coke; c) separating the ash, heating the solid particle, and transporting the solid particle into the gasifier; d) cooling the ash, and separating the coke; and e) introducing the crude synthetic gas into the gasifier, transporting the coke into the gasifier while spraying saturated water vapor into the gasifier, contacting the coke and the crude synthetic gas with the saturated water vapor at 1200-1600° C.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUNSHINE KAIDI NEW ENERGY GROUP CO LTD430223 KATIE BUILDING NO 1 JIANGXIA ROAD EAST LAKE NEW TECHNOLOGY DEVELOPMENT ZONE WUHAN HUBEI WUHAN CITY HUBEI PROVINCE 430223

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Yilong Wuhan, CN 68 167
Tang, Hongming Wuhan, CN 7 19
Zhang, Yanfeng Wuhan, CN 177 515

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 2, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00