Fuel cell system with variable Coanda amplifiers for gas recirculation and system pressure regulation

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9028991
APP PUB NO 20070259226A1
SERIAL NO

10589199

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A Coanda flow amplifier has a suction intake, an outlet, a fluid channel extending between the suction intake and the outlet, and a drive-flow inlet, which is fluidly connected to the fluid channel via a drive-flow discharge slit, whereby the flow cross section of the drive-flow discharge slit is variably adjustable. In a method to operate the Coanda flow amplifier, the variably adjustable flow cross section of the drive-flow discharge slit is chosen such that a pressure ratio between an output pressure of the drive flow when it leaves the drive-flow discharge slit, and an intake pressure of the drive flow when it enters the drive-flow discharge slit, does not exceed a critical pressure ratio. A fuel cell system comprises at least one fuel cell, a fluid source, a fluid line, and a Coanda flow amplifier arranged in the fluid line, whereby the Coanda flow amplifier is equipped with a drive-flow discharge slit with a variably adjustable flow cross section.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NUCELLSYS GMBHNEUE STR 95 73230 KIRCHHEIM/ TECK-NABERN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Knoop, Andreas Esslingen, DE 22 78
Sang, Jochen Kirchheim/Teck, DE 7 65

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 12, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00