gas in cement-manufacturing facilities, and processes for manufacturing cement

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9028249
APP PUB NO 20120141354A1
SERIAL NO

13389739

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An object of the present invention is to separate CO2 gas generated in a cement-manufacturing facility in a high concentration and recover the CO2 gas. The present invention includes: feeding a cement material before calcination and a heat medium which has a particle diameter larger than that of the cement material and has been heated to the calcination temperature or higher in a medium-heating furnace (14), to a mixing calciner (12); and recovering the CO2 gas generated by the calcination of the cement material. The heat medium circulates between the medium-heating furnace and the mixing calciner. Another aspect of the present invention includes: feeding a cement material before calcination to a regenerative calciner (112) which has been heated to the calcination temperature or higher and has stored heat therein; and recovering the CO2 gas generated by the calcination of the cement material.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI MATERIALS CORPORATIONTOKYO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Higuchi, Naohiro Ibaraki, JP 4 2
Komatsu, Takuya Ibaraki, JP 25 248
Shima, Hirokazu Ibaraki, JP 15 19
Takayama, Yoshinori Ibaraki, JP 27 66
Wang, Junzhu Ibaraki, JP 12 14

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 12, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00