Method and device for the production of a stamping with enlarged functional surface

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9027379
APP PUB NO 20090173129A1
SERIAL NO

12283705

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method and a device for the production of a stamping with an enlarged functional surface, for example, fine blanking a workpiece out of a flat strip, wherein the flat strip is clamped between an upper part including a shearing punch, a pressure pad for the shearing punch, a V-shaped projection arranged on the pressure pad and an ejector which is pressed into the flat strip, and a lower part including a cutting die and an ejector. Edge rollover is avoided by preforming, before cutting begins, a negative with regard to the cutting direction with a preforming element in the direction opposite to the cutting direction that corresponds to the expected edge rollover into the cutting die with regard to size and geometry at cutting, generating a material volume at the side of the rollover in a mirror-inverted form. During cutting, the preformed area is supported by the preforming element.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FEINTOOL INTERNATIONAL HOLDING AGSWITZERLAND ZUG ZUG

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Marti, Andreas Iffwil, CH 5 4
Schlatter, Ulrich Lyss, CH 7 20

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 12, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00