Current-to-voltage converter and electronic apparatus thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9024664
APP PUB NO 20140333348A1
SERIAL NO

14018457

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A current-to-voltage converter which is used to receive an input current and to generate an output voltage accordingly comprises a current tracking bias circuit, a current-to-voltage unit, and a voltage clamp bias circuit. The current tracking bias circuit generates a first bias according to the input current. The current-to-voltage unit receives the first bias and the input current, and generates the output voltage according to the input current, wherein the first bias determines a range of the input current, the current-to-voltage unit has a first current control device, and the first current control device changes a current conduction level thereof in response to the first bias, such that a rising or falling speed of the output voltage is enhanced. The voltage clamp bias circuit clamps voltage levels of two ends where the voltage clamp bias circuit is connected to the current-to-voltage unit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ILI TECHNOLOGY CORP10F -1 NO 1 TAIYUAN 2ND ST ZHUBEI CITY HSINCHU COUNTY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cheng, Chih-Jen Hsinchu, TW 36 145
Hsu, Cheng-Chung Hsinchu County, TW 58 458

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 5, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00