Flexible polyurethane foam

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9023907
APP PUB NO 20070232711A1
SERIAL NO

11579119

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Flexible polyurethane foam is made by mixing prepolymer with foam-forming ingredients comprising isocyanate and water which react to give carbon dioxide. The prepolymer is hydroxyl-tipped, being made by reacting polyol with less than the theoretical proportion of isocyanate required to react with available hydroxyl groups of the polyol. The prepolymer is a new storage stable starting material for use in making flexible polyurethane foam, and the foam produced with the prepolymer has advantageous properties with regard to hydrolysis resistance. The prepolymer may be made with low or high viscosity by appropriate selection of the proportion of isocyanate which reacts with the polyol. At high viscosities cell structure can be advantageously controlled by appropriate gasification or degasification during foaming.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RECTICEL ENGINEERED FOAMS SWITZERLAND AGOBERWOLFHAUSERSTRASSE 9 CH-8633 WOLFHAUSEN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Frei, Hans Jona, CH 16 94
Mispreuve, Henri Wangen, CH 4 22
Naescher, Reinold Zurich, CH 2 18
Schoenenberger, Kurt Siebnen, CH 2 18
Tenzi, Stefano Wetzikon, CH 1 7

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 5, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00