Particle defoamer comprising a silicone emulsion and process for preparing same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9023781
APP PUB NO 20140142020A1
SERIAL NO

13989029

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for preparing a particle defoamer. The particle defoamer of 55%-75% of a carrier, 15%-35% of a silicone emulsion, 3%-10% of a texturing agent and 2%-10% of a solvent, based on the total weight of the particle defoamer; the process for preparing the particle defoamer is: (1)first adding a carrier A1 into a mixer, and then adding thereto a silicone emulsion B1, and stirring uniformly; (2)adding a carrier component A2 to the mixture obtained in (1), and stirring uniformly; (3)adding a silicone emulsion B2 to the mixture obtained in (2), and, after uniformly stirring, adding the solvent thereto and stirring uniformly; and (4)pelleting and drying by baking the mixture obtained in(3), so as to produce the product.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NANJING SIXIN SCIENTIFIC-TECHNOLOGICAL APPLICATION RESEARCH INSTITUTE CO LTDNANJING 210027 JIANGSU

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cao, Tian Jiangsu, CN 9 20
Chi, Yueqin Jiangsu, CN 1 5
Huang, Wei Jiangsu, CN 1002 7727
Sui, Hualan Jiangsu, CN 1 5
Wu, Fei Jiangsu, CN 179 1254
Zhang, Qiang Jiangsu, CN 790 5324

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 5, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00