Progressive-power lens designing method, progressive power lens designing system, and progressive-power lens

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9022559
APP PUB NO 20110222019A1
SERIAL NO

13041147

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A progressive-lens designing system includes a manufacturer-side terminal installed in a lens manufacturer connected to a shop-side terminal installed in a spectacle shop or any other location via a network. The manufacturer-side terminal includes an optimization coefficient setting section that uses a variety of data received from the shop-side terminal to set an optimization coefficient for each target object in specific work, a dioptric power computing section that computes target dioptric power for each target object, a lens designing section that performs lens design, and an order processing section that performs order processing when receiving an order placed from the shop-side terminal.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HOYA LENS MANUFACTURING PHILIPPINES INCSPECIAL EXPORT PROCESSING ZONE GATEWAY BUSINESS PARK JAVALERA GENERAL TRIAS CAVITE

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ito, Ayumu Minowa-machi, JP 27 200
Mori, Takateru Minowa-machi, JP 10 62
Suzuki, Yohei Minami-Minowa-mura, JP 112 419

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 5, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00