Wind turbine generator installation by airship

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9022315
APP PUB NO 20120091274A1
SERIAL NO

13377380

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a method for handling at least one wind turbine generator component 104, 106, 108. The method comprises the steps of loading said at least one wind turbine generator component 104, 106, 108 to an airship 100 at a site of loading, transporting the airship 100 with the at least one wind turbine generator component from the site of loading of the at least one wind turbine generator component to the site of installation of the at least one wind turbine component, and unloading said at least one wind turbine generator component from the airship at the site of unloading by means one or more guide elements 150 extending between the at least one wind turbine generator component and another wind turbine generator component or the ground, the sea, a vehicle at the ground, or at a vessel at the sea. The invention also relates to use of an airship for installing wind turbine generator components.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
VESTAS WIND SYSTEMS A/SHEDEAGER 42 AARHUS N DK-8200

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kirt, Rune Copenhagen East, DK 2 2
Thomsen, Mads Bækgaard Copenhagen N, DK 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 5, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00