Water energy conversion system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9021826
SERIAL NO

14205330

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A water energy conversion system includes a control unit, a first gas-water energy conversion device, a second gas-water energy conversion device, a water supply device, a storage tank and a heat source unit. Water for different purposes is supplied by the water supply device that collects and transmits various kinds of water resources. Operations of the storage tank as well as the first and second gas-water energy conversion devices are based on water as the basis and a carrier of energy conversion to provide effective energy conversion and recycling. By further employing the heat source unit, high-efficiency cooling, heat dissipation or heat absorption can be achieved with minimal power and water consumption. Thus, the water energy conversion system is applicable for energy conversion, energy regulation and supply for air of indoors and outdoors of a building to realize effects of water storage and supply, anti-flooding, and energy saving and storage.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HER JIU TECHNOLOGY CO LTDNO 33 LN 157 YONGFONG RD TAIPING DIST TAICHUNG CITY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Weng, Chien-Lun Taichung, TW 2 0
Weng, Ching-Ju Taichung, TW 2 0
Weng, Kuo-Liang Taichung, TW 38 242
Weng, Ling-Hua Taichung, TW 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 5, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00