Electronic caliper configured to generate power for measurement operations

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9021715
APP PUB NO 20140150272A1
SERIAL NO

13705105

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An electronic caliper generates power for measurement operations. The caliper comprises a scale member, a slider, a signal processing portion configured to measure a displacement between the scale member and slider, a power generating arrangement attached to the slider comprising a gear assembly configured to rotate in response to a force provided through a power generating handle to the gear assembly by a user moving the power generating handle relative to the gear assembly, and a power generator coupled to the gear assembly and configured to rotate in response to force provided by the rotating gear assembly and provide power to the signal processing portion. The power generating arrangement generates power as the user moves the power generating handle, and the power generating arrangement contributes a motion resistance force component of at most 20N as the user moves the power generating handle with a maximum manual acceleration.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITUTOYO CORPORATION20-1 SAKADO 1-CHOME TAKATSU-KU KAWASAKI-SHI KANAGAWA 213-8533

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Emtman, Casey Kirkland, US 4 72
Nahum, Michael Kirkland, US 50 767

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 5, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00