Lens-equipped optical semiconductor device and method for manufacturing the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9018663
APP PUB NO 20140027807A1
SERIAL NO

14110816

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A lens-equipped optical semiconductor device including: an optical semiconductor device including at least one optical semiconductor element mounted on a substrate and a transparent resin encapsulating body that encapsulates the optical semiconductor element; a resin lens having a recessed portion for housing the transparent resin encapsulating body; and a transparent resin layer filled into a space among the substrate, the recessed portion, and the transparent resin encapsulating body, wherein the recessed portion has a capacity that is at least 1.1 times a total volume of the optical semiconductor element and the transparent resin encapsulating body.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ASAHI RUBBER INC7-2 DOTE-CHO 2-CHOME OMIYA-KU SAITAMA-SHI SAITAMA 330-0801

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Azuma, Masaru Saitama, JP 2 19
Endo, Satoshi Saitama, JP 85 692
Ichikawa, Akira Saitama, JP 105 2101
Motoyanagi, Takayuki Saitama, JP 5 69
Okabe, Yoshihiro Saitama, JP 6 37
Orikasa, Yoichi Saitama, JP 1 18
Sato, Hideaki Saitama, JP 206 3212
Tasaki, Masutsugu Saitama, JP 16 522

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 28, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00