Photonic semiconductor devices in LLC assembly with controlled molding boundary and method for forming same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9018074
APP PUB NO 20140008778A1
SERIAL NO

13938629

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Embodiments of a laminate leadless carrier package are presented. The package includes an optoelectronic chip, a substrate supporting the optoelectronic chip, a plurality of conductive slotted vias, a wire bond pad disposed on the top surface of the substrate, a wire bond coupled to the optoelectronic chip and the wire bond pad and an encapsulation covering the optoelectronic chip, the wire bond, and at least a portion of the top surface of the substrate. The slotted vias provide electrical connections between the top conductive layer and the bottom conductive layer. The substrate includes a plurality of conductive and dielectric layers laminated together including a bottom conductive layer, a top conductive layer, and a dielectric layer between the top and bottom conductive layers. The encapsulation is a molding compound, and the molding compound is pulled back from at least one of the slotted vias.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EXCELITAS CANADA INC22001 DUMBERRY ROAD VAUDREUIL-DORION J7V 8P7

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Barlow, Arthur John Alton, GB 14 121
Deleon, Jerry Calamba, PH 3 49
Zhang, Xianzhu Pointe-Claire, CA 2 42

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 28, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00