Process for producing colloidal crystal and colloidal crystal

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9017477
APP PUB NO 20110123803A1
SERIAL NO

12994087

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a process for producing colloidal crystals from which a large single crystal reduced in lattice defects and unevenness can be easily produced at low cost without fail. The process for colloidal crystal production comprises: preparing a colloidal polycrystal dispersion in which colloidal crystals precipitate at a given temperature (preparation step); introducing into a vessel The colloidal polycrystal dispersion in the state of containing fine colloidal polycrystals precipitated (introduction step); and melting the colloidal polycrystals and then recrystallizing the molten polycrystals (recrystallization step). The crystals thus obtained have fewer lattice defects and less unevenness than the original polycrystals.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NAGOYA CITY UNIVERSITY1 AZA KAWASUMI MIZUHO-CHO MIZUHO-KU NAGOYA-SHI AICHI 467-8601
FUJI CHEMICAL CO LTD3-2-33 HIGASHINODA-CHO MIYAKOJIMA-KU OSAKA-SHI OSAKA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Onda, Sachiko Nagoya, JP 2 11
Shinohara, Mariko Nagoya, JP 1 11
Toyotama, Akiko Nagoya, JP 8 23
Uchida, Fumio Osaka, JP 30 196
Yamanaka, Junpei Nagoya, JP 11 70
Yonese, Masakatsu Nagoya, JP 1 11
Yoshizawa, Koki Nagoya, JP 1 11

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 28, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00