Fuel processing systems with thermally integrated componentry

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9017436
APP PUB NO 20110136027A1
SERIAL NO

13027584

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Hydrogen-producing assemblies, fuel cell systems including the same, methods of producing hydrogen gas, and methods of powering an energy-consuming device. Hydrogen-producing assemblies may include a monolithic body that defines at least a reforming conduit, and in some embodiments a plurality of reforming conduits, in which a feed stream is catalyzed into a reformate gas stream containing hydrogen gas, and a burner conduit, in which a fuel-air stream is combusted. The monolithic body is constructed to conduct heat generated by the exothermic reaction of the combustion from the burner conduit to the reformer conduit. In some hydrogen-producing assemblies, the monolithic body further defines a vaporizing conduit, in which liquid portions of the feed stream are vaporized prior to being delivered to the reformer conduit, and the monolithic body may be constructed to conduct heat from the burner conduit to the vaporizing conduit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
IDATECH LLC63065 NE 18TH STREET BEND OR 97701

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Zhen Bend, US 228 1215
Karim, Kamel Ibrahim John Venetia, US 1 39
Ouyang, Xun Bend, US 4 65
Renn, Curtiss Bend, US 16 394
Sturko, Ryan Thomas Bend, US 2 56

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 28, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00