Apparatus and method for controlling a locomotive consist

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9014884
APP PUB NO 20140263861A1
SERIAL NO

14202018

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A locomotive assembly including a legacy locomotive controller and an intercept locomotive controller and a method of controlling a locomotive are disclosed. The locomotive assembly includes a power bus, a locomotive, and an intercept locomotive controller. The locomotive includes a primary power unit coupled to the power bus and a legacy locomotive controller programmed to transmit a control command to the primary power unit. The intercept locomotive controller is electrically coupled between the locomotive controller and the primary power unit and is programmed to intercept an initial locomotive control signal transmitted from the legacy locomotive controller to the primary power unit indicating an amount of locomotive power, modify the initial locomotive control signal, and transmit the modified control signal to the primary power unit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SOO LINE RAILROAD COMPANY120 SOUTH SIXTH STREET SUITE 1000 MINNEAPOLIS MN 55402

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Frazier, Scott Raymond Morrison, US 20 171
Ginter, Karl Beltsville, US 76 2749
Pritchard, Jeffrey Orion Oakland, US 46 668
Pykkonen, Kevin Boulder, US 10 103

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 21, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00