Process for producing a toothed wheel having a herringbone gearing and a process and an apparatus for generating control data to form a herringbone gearing on a workpiece

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9014839
APP PUB NO 20120114441A1
SERIAL NO

13238692

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process and an apparatus for generating control data, wherein a first tooth flank geometry is determined which corresponds to a geometry of a first tooth flank of the herringbone gearing, a second tooth flank geometry is determined which corresponds to a geometry of a second tooth flank of the herringbone gearing, a transition section geometry is determined which corresponds to a geometry of a transition section between the first tooth flank and the second tooth flank, an overall tooth flank geometry is determined which comprises the first tooth flank geometry, the transition section geometry and the second tooth flank geometry, and the control data is generated based on the overall tooth flank geometry and machining paths are indicated, each extending transversely to the profile direction of the tooth flanks and along the first tooth flank geometry, the transition section geometry and the second tooth flank geometry.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DECKEL MAHO PFRONTEN GMBHDECKEL-MAHO-STRASSE 1 PFRONTEN 87459

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hansen, Uwe-Carsten Eisenberg, DE 7 43
Lochbihler, Thomas Vils, AT 10 67
Neumaier, Josef Pfronten, DE 9 84

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 21, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00