Parallel-operating power supply system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9013159
APP PUB NO 20140160814A1
SERIAL NO

14017752

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Each of master and slave switching power supply apparatuses (2m, 2s) has an IGBT (10m or 10s) switching-controlled by a PWM pulse signal produced, based on a clock signal, by a switching device driving PWM pulse output section (28m or 28s), to thereby provide DC power in parallel to a load (5). The clock signal produced in the master switching power supply apparatus (2m) is coupled to the slave switching power supply apparatus (2s) through a photocoupler (36m) in the master switching power supply apparatus (2m) and a photocoupler (38s) of the slave switching power supply apparatus (2s). Also, the clock signal developed at the output of the photocoupler (36m) is coupled through a photocoupler (38m) to the master switching power supply apparatus (2m). The photocouplers (36m, 38m, 38s) have the same delay characteristic.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SANSHA ELECTRIC MANUFACTURING COMPANY LIMITED1-56 NISHIAWAJI 3-CHOME HIGASHIYODOGAWA-KU OSAKA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kawabata, Tatsuya Osaka, JP 11 61
Morimoto, Hiroki Osaka, JP 28 247

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 21, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00