Process for producing biopolymer nanoparticles

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9011741
APP PUB NO 20130062807A1
SERIAL NO

13618075

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In a process for producing a biopolymer nanoparticles, biopolymer feedstock and a plasticizer are fed to a feed zone of an extruder and the biopolymer feedstock is processed using shear forces. A crosslinking agent is added to the extruder downstream of the feed zone. The process has a production rate of at least 1.0 metric tons per hour. The feedstock and the plasticizer are preferably added separately to the feed zone. The extruder may have single flight elements in the feed zone. The temperatures in the intermediate section of the extruder are preferably kept above 100 C. The screw configuration may include two or more steam seal sections. Shear forces in a first section of the extruder may be greater than shear forces in an adjacent downstream section of the first section. In a post reaction section, water may be added to improve die performance.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ECOSYNTHETIX LTD3900 COLLINS ROAD SUITE 1018 LANSING MI 48910

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bloembergen, Steven Okemos, US 36 268
Van, Egdom Edward Lansing, US 4 16
Wildi, Robert H Parkersburg, US 7 94

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 21, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00