Mechanical pyrolysis in a shear retort

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9011646
APP PUB NO 20120193271A1
SERIAL NO

13016328

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Mechanical visbreaking and pyrolysis between counter-rotating coaxial centrifugal impellers in a continuous radial counterflow process minimizes wastewater discharges. In one example, a cataclastic shear retort comminutes, shear thins, and shear heats an axial feed, such as tar sand, oil shale, coal tailings, distillation bottoms, or lignite. Pyrolyzing the feedstock in this shear retort yields a product stream of gases, naphthas, and oils which first mixes with the feedstock and then is axially extracted, while spent solids are simultaneously extruded from the periphery as coked devolatilized residue, such as char sand for upgrading soil to terra preta. Recirculation of shear-heated solids in long residence time within the shear retort brings heat from the spent solids at the periphery to the feedstock without an external heated sand loop. CO2 emissions from combustion to heat water for oil extraction are eliminated.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
VORSANA INC11602 NE 192ND AVENUE BRUSH PRAIRIE WA 98606

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
McCutchen, David J Portland, US 18 264
McCutchen, Wilmot H Orinda, US 27 488

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 21, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00