Multi-phase operation with single phase control

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9007037
APP PUB NO 20130229159A1
SERIAL NO

13782983

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A multi-phase control system having multi-phase operation with single phase control includes a main control module, a lineman module, and an add-on lineman module. The main control module and the lineman module control, automatically or manually, the first phase and first phase tap changer of a multi-phase system. The add-on lineman module and the main control module control, automatically or manually, additional phases of the multi-phase system. In certain example embodiments, the multi-phase control system detects when a line voltage of an additional phase is de-energized and allows the tap changer of the additional phase to be powered by a line voltage of the first phase. In certain example embodiments, the tap changer of a de-energized phase is powered by an external power supply.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EATON INTELLIGENT POWER LIMITED30 PEMBROKE ROAD DUBLIN D04Y0C2

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Brenny, Timothy P Waukesha, US 1 7
Colopy, Craig A Brookfield, US 3 9
Coughlin, Christopher J Menomonee Falls, US 2 9
Daley, Daniel J Waukesha, US 4 10
Kromrey, Timothy M Milwaukee, US 1 7

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 14, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00