Charged particle beam writing apparatus and charged particle beam writing method using a generated frame that surrounds a first data processing block

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9006691
APP PUB NO 20120292536A1
SERIAL NO

13465221

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A charged particle beam writing apparatus includes a unit to divide a chip region into first data processing blocks, a unit to, in each block, extract a cell whose reference position is located in the block concerned from cells each including at least one figure pattern, a unit to, for each block, generate a first frame that surrounds the block concerned and the cell extracted, a unit to, for each first frame, divide the inside of the first frame concerned into mesh regions and calculate an area density of a figure pattern in each mesh, a unit to combine area densities of mesh regions which are overlapped with each other and between different first frames, a unit to calculate a dose of beam by using the area density, and a unit to write a pattern on a target workpiece by irradiating the beam of the dose calculated.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NUFLARE TECHNOLOGY INC8-1 SHINSUGITA-CHO ISOGO-KU YOKOHAMA-SHI KANAGAWA 2358522 ?2358522

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Anpo, Akihito Tokyo, JP 18 209
Yashima, Jun Kanagawa, JP 30 293

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 14, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00