Semiconductor device and method of forming a power MOSFET with interconnect structure silicide layer and low profile bump

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9006099
APP PUB NO 20120313147A1
SERIAL NO

13156281

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A semiconductor device has a substrate with a source region and a drain region formed on the substrate. A silicide layer is disposed over the source region and drain region. A first interconnect layer is formed over the silicide layer and includes a first runner connected to the source region and second runner connected to the drain region. A second interconnect layer is formed over the first interconnect layer and includes a third runner connected to the first runner and a fourth runner connected to the second runner. An under bump metallization (UBM) is formed over and electrically connected to the second interconnect layer. A mask is disposed over the substrate with an opening in the mask aligned over the UBM. A conductive bump material is deposited within the opening in the mask. The mask is removed and the conductive bump material is reflowed to form a bump.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GREAT WALL SEMICONDUCTOR CORPORATIONP O BOX 24619 TEMPE AS 85285

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Anderson, Samuel J Tempe, US 61 505
Okada, David N Chandler, US 27 399

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 14, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00