Flow counter

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9002664
APP PUB NO 20110288794A1
SERIAL NO

13110134

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A flow counter capable of correctly checking an operating state of the flow counter and leakage and correctly indicating a total amount of flow by allowing the rotation of a pointer to be learned accurately in the form of numerical data. In this flow counter (1), rotation of a flow detection driving gear (5) is transmitted to a flow indication section (4) composed of a plurality of digit wheels (4a1 to 4a8) by a main gear train section (2). The rotation of the flow detection driving gear (5) is also transmitted to a first pointer (6) by a branch gear section (3) branched from the main gear train section (2). The first pointer (6) indicates the operating state of the flow detection driving gear (5). The flow indication section (4) indicates a total amount of flow. A rotation detection member, which is a component of a rotation sensor, is integrally rotatably mounted on a rotating shaft of the first pointer (6). An amount of rotation of the rotating shaft is electrically detected by a rotation sensor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ENPLAS CORPORATIONSAITAMA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Huiqing Saitama, JP 1 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 7, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00