Composite nanoparticles and manufacturing method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8999206
SERIAL NO

13058674

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Metal nanoparticles having improved migration resistance are provided. The present invention relates to a method for manufacturing composite nanoparticles including obtaining composite nanoparticles containing at least silver and copper in a single particle by heat treating a mixture containing an organic silver compound and an organic copper compound at a temperature of 150° C. or more in a non-oxidative atmosphere in the presence of a tertiary amine compound represented by the general formula R1R2R3N (wherein R1 through R3 are optionally substituted alkyl groups or aryl groups that may be the same or different, R1 through R3 may be linked in a ring, and the number of carbon atoms in each of R1 through R3 is 5 through 18 and may be the same or different).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
OSAKA RESEARCH INSTITUTE OF INDUSTRIAL SCIENCE AND TECHNOLOGY7-1 AYUMINO 2-CHOME IZUMI-SHI OSAKA-FU 594-1157

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kakiuchi, Hiroshi Osaka, JP 6 62
Kashiwagi, Yukiyasu Kishiwada, JP 5 22
Matsumura, Shinsuke Osaka, JP 2 11
Nakamoto, Masami Takarazuka, JP 8 68
Yamamoto, Mari Osaka, JP 35 263
Yoshida, Yukio Osaka, JP 78 937

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 7, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00