Hybrid riser tower and methods of installing same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8998539
APP PUB NO 20120292039A1
SERIAL NO

13460777

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed is a riser including a plurality of pipelines. In one example there are three such pipelines extending from the seabed toward the surface and having an upper end supported at a depth below the sea surface. In one embodiment, a first of the pipelines acts as a central structural core, and the other pipelines are arranged around the first pipeline. In another embodiment, three pipelines are arranged around a structural core. In each case, the first of the pipelines can be a fluid injection line, and the other pipelines are production lines. Also disclosed is a riser having buoyancy along at least a part of its length. The buoyancy results in the riser having a generally circular cross-section, the circumference of which is non-contiguous. Methods of installing such risers are also described.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ACERGY FRANCE SAS1 QUAI MARCEL DASSAULT SURESNES F-92150

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Branchut, Jean-Pierre Houston, US 4 24
De-Roux, Gregoire Paris, FR 2 6
Saint-Marcoux, Jean-Francois Paris, FR 5 27

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 7, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00