Tension link for drill floor substructure assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8997428
APP PUB NO 20130291462A1
SERIAL NO

13875053

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a new tension link drill floor level connection system for use on a drilling rig, as may be used in subterranean exploration. The present invention provides a tension link assembly for resisting separating forces incurred between sections of the substructure. In particular, the tension link assembly may be located at the drill floor level for resisting the separating forces imparted by “splayed” or wide leg mast structures that tend to separate substructure side boxes from the substructure center section. The present invention may be comprised of a first link element and a second link element with a tension link being connectable over the first and second link elements to resist separation between sections of the substructure. A latch mechanism may be utilized to prevent upward movement of the tension side boxes or center section relative to the drill floor or to one another.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
T&T ENGINEERING SERVICES INC16131 N ELDRIDGE PKWY TOMBALL TX 77377

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Orgeron, Keith J Spring, US 52 976
Souchek, Richard D Richmond, US 4 126

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 7, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00