Variable venting and damping arc mitigation assemblies and methods of assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8993916
APP PUB NO 20140160634A1
SERIAL NO

13707845

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Equipment protection systems, arc containment devices, and methods of assembling arc containment devices are disclosed. In one example, an electrical isolation structure includes a conductor base, a cover coupled to the conductor base and defining an isolation chamber, a containment shield disposed on the conductor base within the isolation chamber, and a biasing assembly positioned between the cover and the containment shield. The containment shield defines a containment chamber configured to enclose the plurality of electrode assemblies. The containment shield is configured to at least partially contain the arc products within the containment chamber. The biasing assembly is configured to permit the containment shield to move away from the conductor base to thereby define a gap between the conductor base and the containment shield to enable at least some of the arc gases to vent from the containment chamber.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ABB S P AVIA VITTOR PISANI 16 20124 MILANO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gopularam, Chandrakanth Secunderabad, IN 2 18
Kumar, Ravi Secunderabad, IN 141 3082
Palvadi, Srinivas Naga Secunderabad, IN 6 27

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 30, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00