Method of operating regenerative heaters in blast furnace plant

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8992823
APP PUB NO 20140252696A1
SERIAL NO

14352744

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In a blast furnace plant, at least three regenerative heaters are cyclically operated on blast and on gas: while a regenerative heater is operated on gas, hot flue gas is produced and caused to flow through the regenerative heater so as to heat the heat storage elements; and while a regenerative heater is operated on blast, process gas, i.e. a CO-rich fraction of the top gas, is blown through the regenerative heater so that the process gas takes up heat from the heat storage elements, such that during a changeover of a regenerative heater from on-blast to on-gas operation, the regenerative heater is purged from process gas using flue gas collected after having flown through at least one of the regenerative heaters.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PAUL WURTH DEUTSCHLAND GMBHHAGENAUER STRASSE 47 WIESBADEN 65203

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Allmannsdörfer, Ralf Mainz-Kastel, DE 1 2
Eschmann, Friedrich Bischofsheim, DE 6 10
Heilhecker, Sylvia Nauheim, DE 1 2
Münzer, Johannes Bad Schwalbach, DE 2 2
Simoes, Jean-Paul Walferdange, LU 13 23

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 30, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00