Method for managing the transfer of information packets across a wireless and routing nodes implementing it

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8982857
APP PUB NO 20100202335A1
SERIAL NO

12451837

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A wireless network includes permanently powered routing nodes and intermittently operating routing nodes. A polling procedure is used for transferring routing and data information packets from a permanently powered routing node to an intermittently operating routing node. In particular, when the permanently powered routing node has to transmit an information packet to the intermittently operating routing node, it stores the information packet in a memory; it waits until the intermittently operating routing node is able to receive information packets; and then it transmits the information packet to the intermittently operating routing node, and when the intermittently operating routing node has to transmit an information packet to the permanently powered routing node, it transmits immediately the information packet to the permanently powered routing node.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TELECOM ITALIA S P A20123 MILANO
PIRELLI & C S P AVIA GAETANO NEGRI 10 20123 MILANO

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Borean, Claudio Turin, IT 19 405
Coleri, Ergen Sinem Berkeley, US 6 119
Giannantonio, Roberta Turin, IT 8 71

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 17, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00