Arc mitigation assembly and method of assembly to avoid ground strike

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8981248
APP PUB NO 20140158666A1
SERIAL NO

13707822

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A circuit protection device is provided for use with a circuit that includes at least one pair of conductors. The protection device is configured to generate an arc. The protection device includes at least a pair of electrode assemblies electrically coupled to the at least one pair of conductors and a conductor base to support the pair of electrode assemblies. The protection device includes a cover coupled to the conductor base and defining at least one isolation chamber, wherein the electrode assemblies are disposed within the isolation chamber. The protection device includes a containment shield moveably coupled to the cover. The containment shield defines a containment chamber configured to contain charged particles produced by the arc. The containment shield is operative to move relative to the cover in response to a change in pressure produced by the arc within the containment chamber. An isolation assembly is coupled to at least one of the cover and the containment shield and configured to prevent the cover from contacting the containment shield.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ABB S P AVIA VITTOR PISANI 16 20124 MILANO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kumar, Ravi Secunderabad, IN 141 3082
Pachunoori, Sudhakar Sambaiah Hyderabad, IN 3 17
Palvadi, Srinivas Naga Secunderabad, IN 6 27

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 17, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00