Membrane reactor for treating gases containing tritium

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8979984
APP PUB NO 20130108517A1
SERIAL NO

13704706

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An apparatus for recovery of tritium from contaminated gaseous mixtures by way of isotope-exchange processes includes a container having a preferably cylindrical shape made of steel or other suitable metal or glass, referred to as “module” (1), which contains at least one permeator tube (T) made of metal or metal alloy selectively permeable to hydrogen and its isotopes, wherein the tube (T) is set in cantilever fashion with its free end closed, there being further provided elements for applying an axial tensile force on the free end of the permeator tube (T) and elements for electrical connection of the free end of the tube (T) to an end flange (FF) of the module (1) adjacent thereto.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
COMMISSARIAT A L'ENERGIE ATOMIQUE ET AUX ENERGIES ALTERNATIVESPARIS FRANCE PARIS PARIS
ENEA - AGENZIA NAZIONALE PER LE NUOVE TECNOLOGIE L'ENERGIA E LO SVILUPPO ECONOMICO SOSTENIBILE00196 ROMA (RM)

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Borgognoni, Fabio Iesi, IT 2 13
Ghirelli, Nicolas St Maximin, FR 3 13
Liger, Karine Pertuis, FR 4 17
Marini, Fabrizio Frascati, IT 7 15
Santucci, Alessia Colonna, IT 2 13
Tosti, Silvano Frascati, IT 2 13
Trabuc, Pierre Venelles, FR 3 13

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 17, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00