Vortex flow type water surface control device for draining device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8979432
APP PUB NO 20080023074A1
SERIAL NO

11570813

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In a conventional storm overflow chamber of a combined sewer system, inflowing floating debris do not flow into an intercepting pipe in a rainy weather, and flow out to a public water body, causing a water pollution in the public water body. According to a vortex flow type water surface control device for a draining device of the present invention, a control plate (6) higher than at least a separating weir (1) is provided between an opening of an inflow pipe (2) and an opening of an intercepting pipe (3) in a storm overflow chamber of a combined sewer system. Moreover, a guide wall (7) higher than at least the separating weir (1) is provided along the separating weir between the opening of the inflow pipe (2) and the separating weir (1).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOKYO METROPOLITAN GOVERNMENTSHINJUKU-KU TOKYO 163-8001
NIPPON KOEI CO LTD5-4 KOJIMACHI CHIYODA-KU TOKYO 1028539 ?1028539
TOKYO METROPOLITAN SEWERAGE SERVICE CORPORATION6-2 OTEMACHI 2-CHOME CHIYODA-KU TOKYO 100-0004

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Banba, Shouichi Tokyo, JP 2 6
Ishiwada, Hirofumi Tokyo, JP 2 6
Komatsu, Hiroshi Chiba, JP 153 2178
Nishimura, Shigeki Saitama, JP 51 503
Ochiai, Tsuneo Tokyo, JP 4 33
Tukada, Shigeru Saitama, JP 2 6
Uchino, Aya Tokyo, JP 3 6
Uemura, Ikuo Saitama, JP 2 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 17, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00