Ferromagnetic amorphous alloy ribbon and fabrication thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8974609
APP PUB NO 20120048428A1
SERIAL NO

12923074

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A ferromagnetic amorphous alloy ribbon includes an alloy having a composition represented by FeaSibBcCd where 80.5≦a≦83 at. %, 0.5≦b≦6 at. %, 12≦c≦16.5 at. %, 0.01≦d≦1 at. % with a+b+c+d=100 and incidental impurities, the defect length along a direction of the ribbon's length being between 5 mm and 200 mm, the defect depth being less than 0.4×t μm and the defect occurrence frequency being less than 0.05×w times within 1.5 m of ribbon length, where t and w are ribbon thickness and ribbon width, respectively, and the ribbon in its annealed state and straight strip form of the ribbon, has a saturation magnetic induction exceeding 1.60 T, and exhibits a magnetic core loss of less than 0.14 W/kg when measured at 60 Hz and at 1.3 T induction level. The ribbon is suitable for use in transformer cores, rotational machines, electrical chokes, magnetic sensors and pulse power devices.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PROTERIAL LTD6-36 TOYOSU 5-CHROME KOTO-KU TOKYO 135-0061

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hasegawa, Ryusuke Morristown, US 58 551
Matsumoto, Yuji Tottori, JP 129 729
Ogawa, Yuichi Myrtle Beach, US 118 745
Perrozi, James Myrtle Beach, US 2 9
Theisen, Eric A Myrtle Beach, US 3 12

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 10, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00