Variably configurable wellbore junction assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8967277
SERIAL NO

13152759

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of installing a wellbore junction assembly in a well can include connecting at least two tubular strings to one opposite end of a tubular string connector with similarly dimensioned oriented connections, whereby the tubular strings are interchangeably connectable to the connector by the oriented connections. A wellbore junction assembly can include at least two tubular strings and a tubular string connector having opposite ends. Each of the tubular strings may be secured to one opposite end of the connector by oriented connections, whereby each of the tubular strings has a fixed rotational orientation relative to the connector. A well system can include a tubular string connector, each of first and second tubular strings being secured to the connector, and a support which reduces bending of the second tubular string which results from deflection of the second tubular string from one wellbore section into another wellbore section.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HALLIBURTON ENERGY SERVICES INC3000 N SAM HOUSTON PARKWAY E HOUSTON TX 77032-3219

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ranjeva, Jean-Michel Rio de Janeiro, BR 2 37
Steele, David J Arlington, US 57 1074

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 3, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00