Oxide superconductor cabling and method of manufacturing oxide superconductor cabling

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8965469
APP PUB NO 20130085071A1
SERIAL NO

13578344

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed are an oxide superconductor tape and a method of manufacturing the oxide superconductor tape capable of improving the length and characteristics of superconductor tape and obtaining stabilized characteristics across the entire length thereof. A Y-class superconductor tape (10), as an oxide superconductor tape, comprises a tape (13) further comprising a tape-shaped non-oriented metallic substrate (11), and a first buffer layer (sheet layer) (12) that is formed by IBAD upon the tape-shaped non-oriented metallic substrate (11); and a second buffer layer (gap layer) (14), further comprising a lateral face portion (14a) that is extended to the lateral faces of the first buffer layer (sheet layer) (12) upon the tape (13) by RTR RF-magnetron sputtering.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SWCC CORPORATION1-14 NISSHIN-CHO KAWASAKI-KU KAWASAKI-SHI KANAGAWA 2100024 ?2100024

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Aoki, Yuji Tokyo, JP 140 1938
Hasegawa, Takayo Tokyo, JP 7 19
Kaneko, Atsushi Tokyo, JP 85 2579
Koizumi, Tsutomu Tokyo, JP 14 50
Nakanishi, Tatsuhisa Tokyo, JP 2 9

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 24, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00